this picture show the initial die T-table at PHN industries. this picture taken on the industry visit by my senior. it is clearly can see the die T-table at PHN industries are applied at the side of the press machine. at the of this post show a short video of die T-table.
Sunday, October 13, 2013
Sunday, October 6, 2013
Main Refernces
In this project, there are 3 main thesis that related to this project. furthermore, this project is the continuity of those thesis concept. the concept is single minute exchange die (SMED). those thesis is;
- Che Ungku Nuzuwal Ikram Bin Che Ungku Abdullah, 2013 "Design and Development an Ergonomic SMED External Preparation for Small die Press at FKP", Faculty of Manufacturing Engineering University Malaysia Pahang.
- Siti Solehah Binti Mohd Rusadi, 2013 "Design and Development of SMED Quick Die Change Tools for Small Press Die", Faculty of Manufacturing Engineering University Malaysia Pahang.
- Normala Binti Zulkifli, 2013 "Human Simulation Study for Ergonomics SMED External Preparation of Small Die Press at FKP" Faculty of Manufacturing Engineering University Malaysia Pahang.
Tuesday, October 1, 2013
Chap1
in this chapter, there are several point of this project delivered and all of those are more likely an overview and view to whole project. hopefully this chapter will make the project overview delivered clearly about this project. it is consist of problem statement, objective, and the project scope.
Labels:
chap1,
objective,
problem statement,
project scope
Location:
Pekan, Pahang, Malaysia
Subscribe to:
Comments (Atom)



